Project Overview

The Aligoudarz Wastewater Treatment Plant is a vital infrastructure project designed to collect, transfer, and treat urban wastewater. It plays a key role in improving public health, protecting water resources, and supporting sustainable urban development.

Project value:

2.258.496

$

$2.258.496

Project value:

Project Objectives and Outcomes

Improve public health standards in Aligoudarz Prevent contamination of surface and groundwater resources Establish a sustainable infrastructure for wastewater treatment and reuse Reduce environmental impact and enhance urban quality of life Enable future urban expansion with eco-friendly sanitation systems

Technical Infrastructure

Mechanical systems including pumps, ventilation, and operational equipment Sedimentation units for separating solids from wastewater flow Chlorination unit for disinfection and water quality improvement Overflow and pressure control structures Site development and administrative facilities for operation and maintenance Auxiliary systems supporting treatment processes and operational safety

Main Components

Construction of the wastewater treatment plant Concrete bridge for crossing 1000 mm sewer pipes Installation of sewer lines with diameters of 600 mm and 800 mm Construction of a return pipeline with a length of 270 meters Mechanical installations and auxiliary units Chlorination unit, sedimentation basins, overflow structures, and control facilities Site development, administrative buildings, and technical support systems Construction of a transfer canal to the treatment plant (1500 meters) Development of a wastewater collection network (3000 meters)

Development of a wastewater collection network (meters)
0
Construction of a transfer canal to the treatment plant (meters)
0
Construction of a return pipeline with a length of (meters)
0