The Razbar Canal Project in Doroud County, Lorestan Province, is a strategic water infrastructure initiative aimed at improving water distribution efficiency, supporting agricultural development, and enhancing regional water management. The project was designed and executed with precision engineering and technical oversight by Khara Dezh.
Project value:
514.958
$
$514.958
: Price
Project Specifications
Construction of open water canal from kilometer 0+000 to 5+400
Extension of open canal from kilometer 5+400 to 10+800
Construction of access roads
Installation of technical buildings and control stations
Integration of flow monitoring systems and hydraulic structures
Technical Components
Open concrete canal with high flow capacity
Technical buildings including control rooms and flow monitoring equipment
Access roads for operation and maintenance
Hydraulic control stations for regulating water pressure and discharge
Project Goals and Outcomes
Reliable and controlled water transfer for agricultural and industrial use
Improved irrigation efficiency across Dorud region
Reduced water loss through engineered concrete structures
Strengthened infrastructure for sustainable water resource management
Enhanced engineering and civil services in Lorestan Province