Project Overview

The Sixth Water Treatment Plant of Tehran is a major infrastructure project aimed at increasing the city’s water treatment capacity, improving water quality, and reducing the operational load on existing facilities. It is a strategic response to the growing population and rising demand for clean, safe drinking water in the capital. | Project start date: September 19, 2023 | Contract duration: 30 months

Project value:

70.090.979

$

$70.090.979

Project value:

Project Objectives

Increase the overall water treatment capacity Improve the quality of treated water to meet national and international standards Reduce pressure on existing treatment plants Ensure sustainable water supply for Tehran’s growing population Minimize environmental impact through advanced technologies Create direct and indirect employment opportunities in the water sector

Main Components of the Project

Process and Structural Units Construction of core facilities including sedimentation basins, filtration units, process control center, mechanical installations, and laboratories Precision engineering of reinforced concrete structures with hydraulic and sanitary compliance Support and Monitoring Units Establishment of a water reuse unit to optimize resource efficiency Energy supply and mechanical system support Advanced monitoring systems for plant operation and maintenance

Key Project Elements

Filtration Units: Removal of physical particles from raw water Process Control Center: Real-time monitoring and management of treatment processes Mechanical Installations: Energy supply and technical support Water Reuse Unit: Recovery and reuse of treated water to reduce waste Supervisory Systems: Continuous monitoring and maintenance of plant performance

Environmental and Social Impact

Plays a vital role in securing sustainable drinking water for Tehran Reduces environmental impact through modern, eco-friendly technologies Generates employment across engineering, operations, and maintenance sectors

Main Components of the Project

Process and Structural Units Construction of core facilities including sedimentation basins, filtration units, process control center, mechanical installations, and laboratories Precision engineering of reinforced concrete structures with hydraulic and sanitary compliance Support and Monitoring Units Establishment of a water reuse unit to optimize resource efficiency Energy supply and mechanical system support Advanced monitoring systems for plant operation and maintenance